A Novel Solution Approach Based on Dominance Evaluation Measure for Project Scheduling in Multi-Project Environments

Thumbnail

Göster/Aç

Ana Makale (427.2Kb)

Erişim

info:eu-repo/semantics/openAccess

Tarih

2024

Yazar

Yousefzadeh, Hamid Reza
Tirkolaee, Erfan Babaee
Kiani, Farzad

Üst veri

Tüm öğe kaydını göster

Künye

YOUSEFZADEH, Hamid Reza, Erfan Babaee TIRKOLAEE & Farzad KIANI. "A Novel Solution Approach Based on Dominance Evaluation Measure for Project Scheduling in Multi-Project Environments". Systems, 12.476 (2024): 1-18.

Özet

The widely recognized measure for resources called resource strength (RS) does not fully capture the resources complexity of a project. Therefore, it cannot be used as a standalone measure to distinguish the complexity of various instances of project scheduling problems. Consequently, additional resource measures such as total amount of overflow (TAO) have been introduced, which should be used in conjunction with the RS. Extensive experimental studies have shown that as the value of TAO increases in a project, scheduling schemes with higher dimensional scheduling schemes such as bi-directional and tri-directional result in schedules with shorter makespans. In this study, an effective approach is proposed for integrating projects in multi-project environments, called the integrated project approach (IPA), taking into account the influence of TAO and building upon the relation between the TAO and the scheduling generation schemes. To assess the performance of IPA, we develop a new random multi-project generator based on the well-known benchmark sets, which utilizes TAO as a control tool to generate instances. The findings indicate that prioritizing the projects and frequency of the projects integration, facilitated by the proposed IPA, have a positive impact on the quality of multi-project schedules.

Kaynak

Systems

Cilt

12

Sayı

476

Bağlantı

https://www.mdpi.com/2079-8954/12/11/476
https://hdl.handle.net/11352/5122

Koleksiyonlar

  • Bilgisayar Mühendisliği Bölümü [198]
  • Scopus İndeksli Yayınlar / Scopus Indexed Publications [630]
  • WOS İndeksli Yayınlar / WOS Indexed Publications [568]



DSpace software copyright © 2002-2015  DuraSpace
İletişim | Geri Bildirim
Theme by 
@mire NV
 

 




| Politika | Rehber | İletişim |

DSpace@FSM

by OpenAIRE
Gelişmiş Arama

sherpa/romeo

Göz at

Tüm DSpaceBölümler & KoleksiyonlarTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTüre GöreDile GöreBölüme GöreKategoriye GöreYayıncıya GöreErişim ŞekliKurum Yazarına GöreBu KoleksiyonTarihe GöreYazara GöreBaşlığa GöreKonuya GöreTüre GöreDile GöreBölüme GöreKategoriye GöreYayıncıya GöreErişim ŞekliKurum Yazarına Göre

Hesabım

GirişKayıt

İstatistikler

Google Analitik İstatistiklerini Görüntüle

DSpace software copyright © 2002-2015  DuraSpace
İletişim | Geri Bildirim
Theme by 
@mire NV
 

 


|| Politika || Rehber || Kütüphane || FSM Vakıf Üniversitesi || OAI-PMH ||

FSM Vakıf Üniversitesi, İstanbul, Türkiye
İçerikte herhangi bir hata görürseniz, lütfen bildiriniz:

Creative Commons License
FSM Vakıf Üniversitesi Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..

DSpace@FSM:


DSpace 6.2

tarafından İdeal DSpace hizmetleri çerçevesinde özelleştirilerek kurulmuştur.