Basit öğe kaydını göster

dc.contributor.authorYousefzadeh, Hamid Reza
dc.contributor.authorTirkolaee, Erfan Babaee
dc.contributor.authorKiani, Farzad
dc.date.accessioned2024-12-17T06:26:25Z
dc.date.available2024-12-17T06:26:25Z
dc.date.issued2024en_US
dc.identifier.citationYOUSEFZADEH, Hamid Reza, Erfan Babaee TIRKOLAEE & Farzad KIANI. "A Novel Solution Approach Based on Dominance Evaluation Measure for Project Scheduling in Multi-Project Environments". Systems, 12.476 (2024): 1-18.en_US
dc.identifier.urihttps://www.mdpi.com/2079-8954/12/11/476
dc.identifier.urihttps://hdl.handle.net/11352/5122
dc.description.abstractThe widely recognized measure for resources called resource strength (RS) does not fully capture the resources complexity of a project. Therefore, it cannot be used as a standalone measure to distinguish the complexity of various instances of project scheduling problems. Consequently, additional resource measures such as total amount of overflow (TAO) have been introduced, which should be used in conjunction with the RS. Extensive experimental studies have shown that as the value of TAO increases in a project, scheduling schemes with higher dimensional scheduling schemes such as bi-directional and tri-directional result in schedules with shorter makespans. In this study, an effective approach is proposed for integrating projects in multi-project environments, called the integrated project approach (IPA), taking into account the influence of TAO and building upon the relation between the TAO and the scheduling generation schemes. To assess the performance of IPA, we develop a new random multi-project generator based on the well-known benchmark sets, which utilizes TAO as a control tool to generate instances. The findings indicate that prioritizing the projects and frequency of the projects integration, facilitated by the proposed IPA, have a positive impact on the quality of multi-project schedules.en_US
dc.language.isoengen_US
dc.publisherMDPIen_US
dc.relation.isversionof10.3390/ systems12110476en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectProject Schedulingen_US
dc.subjectResource Complexity Measureen_US
dc.subjectMulti-Dimensional Scheduling Schemeen_US
dc.subjectMulti-Project Environmenten_US
dc.subjectDominance Evaluation Measureen_US
dc.titleA Novel Solution Approach Based on Dominance Evaluation Measure for Project Scheduling in Multi-Project Environmentsen_US
dc.typearticleen_US
dc.relation.journalSystemsen_US
dc.contributor.departmentFSM Vakıf Üniversitesi, Rektörlük, Alüminyum Test Eğitim ve Araştırma Merkezi (ALUTEAM)en_US
dc.contributor.authorIDhttps://orcid.org/0000-0002-9850-2900en_US
dc.contributor.authorIDhttps://orcid.org/0000-0003-1664-9210en_US
dc.contributor.authorIDhttps://orcid.org/0000-0002-0354-9344en_US
dc.identifier.volume12en_US
dc.identifier.issue476en_US
dc.identifier.startpage1en_US
dc.identifier.endpage18en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.contributor.institutionauthorKiani, Farzad


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster