A Novel Solution Approach Based on Dominance Evaluation Measure for Project Scheduling in Multi-Project Environments

Thumbnail

View/Open

Ana Makale (427.2Kb)

Access

info:eu-repo/semantics/openAccess

Date

2024

Author

Yousefzadeh, Hamid Reza
Tirkolaee, Erfan Babaee
Kiani, Farzad

Metadata

Show full item record

Citation

YOUSEFZADEH, Hamid Reza, Erfan Babaee TIRKOLAEE & Farzad KIANI. "A Novel Solution Approach Based on Dominance Evaluation Measure for Project Scheduling in Multi-Project Environments". Systems, 12.476 (2024): 1-18.

Abstract

The widely recognized measure for resources called resource strength (RS) does not fully capture the resources complexity of a project. Therefore, it cannot be used as a standalone measure to distinguish the complexity of various instances of project scheduling problems. Consequently, additional resource measures such as total amount of overflow (TAO) have been introduced, which should be used in conjunction with the RS. Extensive experimental studies have shown that as the value of TAO increases in a project, scheduling schemes with higher dimensional scheduling schemes such as bi-directional and tri-directional result in schedules with shorter makespans. In this study, an effective approach is proposed for integrating projects in multi-project environments, called the integrated project approach (IPA), taking into account the influence of TAO and building upon the relation between the TAO and the scheduling generation schemes. To assess the performance of IPA, we develop a new random multi-project generator based on the well-known benchmark sets, which utilizes TAO as a control tool to generate instances. The findings indicate that prioritizing the projects and frequency of the projects integration, facilitated by the proposed IPA, have a positive impact on the quality of multi-project schedules.

Source

Systems

Volume

12

Issue

476

URI

https://www.mdpi.com/2079-8954/12/11/476
https://hdl.handle.net/11352/5122

Collections

  • Bilgisayar Mühendisliği Bölümü [214]
  • Scopus İndeksli Yayınlar / Scopus Indexed Publications [756]
  • WOS İndeksli Yayınlar / WOS Indexed Publications [661]



DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback
Theme by 
@mire NV
 

 




| Policy | Guide | Contact |

DSpace@FSM

by OpenAIRE
Advanced Search

sherpa/romeo

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsTypeLanguageDepartmentCategoryPublisherAccess TypeInstitution AuthorThis CollectionBy Issue DateAuthorsTitlesSubjectsTypeLanguageDepartmentCategoryPublisherAccess TypeInstitution Author

My Account

LoginRegister

Statistics

View Google Analytics Statistics

DSpace software copyright © 2002-2015  DuraSpace
Contact Us | Send Feedback
Theme by 
@mire NV
 

 


|| Policy || Guide || Library || FSM Vakıf University || OAI-PMH ||

FSM Vakıf University, İstanbul, Turkey
If you find any errors in content, please contact:

Creative Commons License
FSM Vakıf University Institutional Repository is licensed under a Creative Commons Attribution-NonCommercial-NoDerivs 4.0 Unported License..

DSpace@FSM:


DSpace 6.2

tarafından İdeal DSpace hizmetleri çerçevesinde özelleştirilerek kurulmuştur.